
Network Scheduling Techniques for Construction Project Management
Miklós Hajdu · 1997
איפה לקנות
בדקו את המחיר העדכני באמזון. אנחנו לא מציגים מחירים כי הם משתנים מדי יום.
לצפייה באמזוןקישור שותפים. בתור שותפים של Amazon אנחנו מרוויחים מרכישות מתאימות.
על הספר
The book is a synthesis of the state-of-the-art in project management concepts and techniques. The author places particular emphasis on precedence diagramming (PDM), at present the most widely used scheduling method. New theoretical improvements of PDM are presented, several for the first time in a book, such as: maximal type of precedence relationships, calculating the minimal and maximal available project durations, leveling resources when maximal relationships are used, and precedence diagramming time-cost trade-off. Discussions of computer implementation are included throughout the book. A PC-based software package called `ProjectDirector', containing the theoretical improvements described in the book, is available from the author. Audience: Researchers, and undergraduate and graduate students in civil engineering, industrial engineering and operations research, as well as practitioners, managers, and contractors interested in project management.
פרטי הספר
- שנה
- 1997
- שפה
- English
- סדרה
- Nonconvex Optimization and Its Applications -- 16
- הוצאה
- Springer US
- מהדורות
- 1
- עמודים
- 335
- ISBN
- 9781441947659
מקור הנתונים: Wikidata