Construction scheduling, cost optimization, and managementHojjat Adeli

Construction scheduling, cost optimization, and management
Hojjat Adeli · 2001
Where to buy
Check today’s price on Amazon. We do not show prices because they change daily.
View on AmazonAffiliate link. As an Amazon Associate we earn from qualifying purchases.
About the book
This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.
Book details
- Year
- 2001
- Language
- English
- Publisher
- Spon Press
- Editions
- 1
- Pages
- 320
- ISBN
- 9780203302231
Data source: Wikidata
More by Hojjat Adeli
Control, optimization, and smart structuresHojjat Adeli

Control, optimization, and smart structures
Hojjat Adeli · 1999
Wavelet-based vibration control of smart buildings and bridgesHojjat Adeli

Wavelet-based vibration control of smart buildings and bridges
Hojjat Adeli · 2009
Cost optimization of structuresHojjat Adeli

Cost optimization of structures
Hojjat Adeli · 2006
Cost optimization of structuresHojjat Adeli

Cost optimization of structures
Hojjat Adeli · 2006
Machine learningHojjat Adeli

Machine learning
Hojjat Adeli · 1995
Supercomputing in Engineering Analysis (New Generation Computing, 1)Hojjat Adeli

Supercomputing in Engineering Analysis (New Generation Computing, 1)
Hojjat Adeli · 1991
Mechanics Computing in 1990's and BeyondHojjat Adeli

Mechanics Computing in 1990's and Beyond
Hojjat Adeli · 1991
Parallel Processing in Computational Mechanics (New Generation Computing : 2)Hojjat Adeli

Parallel Processing in Computational Mechanics (New Generation Computing : 2)
Hojjat Adeli · 1991
Knowledge Engineering Vol IHojjat Adeli

Knowledge Engineering Vol I
Hojjat Adeli · 1990
Parallel and Distributed Processing in Structural EngineeringHojjat Adeli

Parallel and Distributed Processing in Structural Engineering
Hojjat Adeli · 1988